
Capabilities
Vertically integrated manufacturing, from tooling to DDP delivery
We own the tooling, the injection lines, the decoration equipment and the packaging assembly. That vertical integration is what allows a 15 million-unit single-SKU annual capacity in drinkware alongside 1,000-unit promotional MOQs — and a 25–30 day production window after purchase order.
Manufacturing
Two production sites, one quality system
Primary manufacturing facility
The group's principal factory has run since 1999 and is vertically integrated across five stages:
- Injection molding — plastic drinkware, toys, kitchenware
- Printing & decoration — pad printing, screen printing, heat transfer, digital
- Assembly — multi-component assembly with QC gates at each station
- Packaging — retail-ready design, printing and pack-out at source
- Warehousing & shipping — pallet-load and container-load export handling
Flagship drinkware categories — plastic cups and color-changing tumblers — carry single-SKU annual production capacity exceeding 15 million units.
Visit the Guangdong factory pageShenzhen Tianlefu Industrial Co., Ltd.
深圳市天乐福实业有限公司 operates a dedicated production line qualified for FMCG-grade promotional drinkware, running in parallel with Shantou.
- FDA-compliant food-contact materials for beverage-consumption products
- Documented export authorization from Nestlé for custom-branded drinkware
- Brand-guardianship controls: trademark usage, Pantone control, artwork approval
- Batch-level documentation traceability — batch records, material COAs, QC reports
- SEDEX SMETA and BSCI third-party audited social compliance
OEM & ODM
From sketch to ship in as few as 25 days
For brands with proprietary design requirements and agencies with client-specific ideas, our OEM/ODM workflow turns concepts into shipped product without exposing the buyer to tooling risk.
Concept intake
A 2D sketch, 3D CAD file, competitor reference or a verbal brief is enough to start.
Feasibility assessment
Material, tooling, cost, MOQ and timeline returned within 3 business days.
Design refinement
Two to three rounds of 3D render revisions are included at no charge.
Prototype & tooling
Physical prototype within 15 days; production tooling within 25 days.
Sample approval
Gold-seal samples issued for client sign-off before any mass production runs.
Mass production
25–30 days after purchase order with 30% deposit received.
Compliance & QA
Third-party inspection at the 50% and 100% production milestones.
Ship & document
Full documentation pack: certificate of origin, MSDS, test reports, packing list.
Innovation
Product technologies developed in our own tooling shop
Innovation at Teemway is applied engineering, not marketing language: each of the technologies below exists as tooled, shipped product.
Color-changing drinkware
Thermochromic ink formulations applied to tumblers and cups that shift color with beverage temperature — the group's most-requested innovation category.
UV-activated printing
Photochromic decoration that reveals artwork under sunlight, used for outdoor brand activations and seasonal retail programmes.
LED-integrated products
Illuminated drinkware and merchandise using safety-compliant lithium button cells, with FCC and RoHS documentation.
Antimicrobial silicone lines
Silicone product lines for health-conscious brand programmes and food-service adjacent merchandise.
Recycled & bio-based materials
rPET, bamboo fiber and RCS-certified recycled material lines for retailers and brands with ESG mandates.
In-house tooling
Custom injection tooling designed and cut for customer-specific SKUs, with tooling ownership terms agreed up front.
Product design and technology assets are held within the group and marketed under the Teemway® and Teemtec® brands. See IP & Trademarks for registration details.
Quality Control
Gates at every stage, audits every year
Inspection protocol
- Incoming materials — material certificates of analysis checked against specification before release to production
- First article — gold-seal sample compared against approved artwork, Pantone references and dimensional drawings
- In-line QC gates — station-level checks during molding, decoration and assembly
- 50% milestone inspection — third-party or in-house AQL inspection during the run
- 100% pre-shipment inspection — final AQL inspection before container loading
- Documentation pack — test reports, COO, MSDS and packing list issued with every shipment
Laboratories we work with
Testing is coordinated with SGS, Intertek, Bureau Veritas and TÜV — or with the buyer's nominated third-party laboratory where a retailer mandates one.
Systems & Audits
- ISO 9001
- SEDEX SMETA 4-Pillar
- BSCI
- SA8000 on request
Product Certifications
- CE
- RoHS
- FDA
- FCC
- EN71 Parts 1–3
- REACH
- CPSIA
- Prop 65
- CCPSA
Commercial Terms
- MOQ 1,000 units/SKU
- 30% deposit + 70% against B/L copy
- T/T · L/C at sight · PayPal for samples
- DDP standard; FOB and EXW on request
- Rush fee from USD $300
Work With Teemway Group
Send us a drawing, a reference product, or just a brief
Feasibility, tooling cost, MOQ and timeline come back within three business days.